Place of Origin: | CHINA |
Brand Name: | BINHAO |
Certification: | CE,RoHS, ISO9001, RoHS |
Model Number: | BH-085 |
Minimum Order Quantity: | 3 T |
---|---|
Price: | Negotiable |
Packaging Details: | pallets and cartons |
Delivery Time: | 15 work days |
Payment Terms: | L/C, T/T |
Supply Ability: | 100000 tons per month |
Humidity: | 80±5%°C | Glossiness: | 87.5% |
---|---|---|---|
Corana: | Treated | Length: | To Order |
Film: | Thin Film | Material: | Heat Stable Transparent BOPP |
Thickness: | 21 Micron | Thermal Shrinkage: | 3.1 |
High Light: | 21 Micron BOPP Film,76mm BOPP Film,21 Micron BOPP Film Packaging |
BOPP Film High Rate Shrinkage 5-8% Thickness 21 Micron Inner Core 76mm
Place of Origin | China |
Brand | Binhao |
Thickness | 10mic - 80mic |
Width | 100mm - 3000mm |
Standard | ISO9001:2020 |
Usage | Packaging |
Packing | Loose Packing / Pallet Packing / Carton Packing |
Color | Transparent / Opaque / Colored |
Corona Treatment | One Side / Both Side |
Processing Type | Extrusion |
Hardness | Soft |
Heatsealable | None / One Side / Both Side |
Core Dimension | 1 Inch - 3.5 Inch |
Logo Printing | Available |
Customization | Customizable as per Customer Requirements |
Anti-static agents are generally added to the middle layer of the film.
Therefore, in order to obtain better anti-static effect, the film generally needs a certain storage period.
In the cigarette factory packaging machine, static electricity can be quickly conducted through metal or electrostatic eliminator and transfer, in addition to the humidity environment is also conducive to the film surface electrostatic.
In case of large electrostatic film or dry season (such as winter), torch factory can put the film into the packaging workshop in advance, the packaging workshop can adjust the humidity is the most ideal, or wet workshop floor with water, or wet towel on the end of the film roll, is one of the emergency solutions.
Shipping & Packaging
*One Roll BOPP Thermal Laminating Film
*18 rolls in a pallet
*10 to 12 pallets loaded into 1*20FCL (appro. 13MTs)
*Or 20 to 22 pallets loaded into a 40 feet container (appro. 25MTs)
Payment Terms:
Payment Terms: | 30% T/T deposit in advance; balance at sight of the copy of B/L. |
Production Lead Time | 20FT container: 15 days after received the deposit. 40GP/HQ: 17-25 days after received the deposit. |
Transportation | By sea or by railway. |
Port | Guangzhou Port |
Remark | If you want to deal with EXW/CIF/CNF term instead of FOB, please specify. Otherwise, FOB price will be quoted under inquiry. |
BOPP Film High Rate Shrinkage 5-8% Thickness 21 Micron Inner Core 76mm
Contact Person: Ms. Cassie Zhang
Tel: 86-13226621655
Fax: 86-20-34330989
Address: R&F New World Center Building, No.307 Middle Of Guangzhou Avenue, Guangzhou, China
Factory Address:Guangdong, China